Station Integration (Masjid Jamek, Titiwangsa & Hang Tuah)

MASJID JAMEK LRT STATION INTEGRATION

Objectives

  • To provide a common concourse for Kelana Jaya and Ampang Line Station and facilitate seamless transfer between both lines.
  • To provide barrier free access for the mobility challenged (OKU)

Main Scope of Work

  • Demolish and relocate the existing ticketing counter room of AMG Line station.
  • Raise partly floor level of existing Concourse 1 of AMG Line station to match plaza floor level and provide facilities for passengers. (Toilets, surau, kiosks, etc.)
  • Provide facilities for OKU such as link bridges (from KLJ to AMG Line), lifts, ramps and a chairlift.
  • Refurbishment of existing AMG Line platform.
  • Provide covered walkway from the station linking to Jalan Melaka Bus Stop (opposite Standard Chartered Bank)
  • Start Date: April 2010

 

 

HANG TUAH LRT STATION INTEGRATION

Start Date: January 2010

New Features:

  • Integration of paid and unpaid area of Hang Tuah LRT Station (Ampang Line)  and Hang Tuah Monorail Station.
  • New OKU facilities such as lifts, OKU toilets, ramps, escalators  and tactiles.
  • New lobby and ticketing counters at Hang Tuah LRT Station (Ampang Line)
  • New kiosks and public facilities (Information counter, Touch n Go POS, etc)
  • New facades and new extended roof
  • New LED lighting and energy saving light fittings
  • Upgrading of power supply and widening of  station platform  (from 3.5 meters to 8.0 meters)

 

 

TITIWANGSA LRT STATION INTEGRATION

Start date: March 2010

New Items:

  • Three numbers of lifts
  • Integration of paid area between Titiwangsa LRT station & monorail station
  • New waiting area, surau and ramps to OKU toilet
  • New queue boxes with tactiles
  • New chairlift for monorail station at existing pedestrian bridge

Upgrading Features:

  • Upgrading of ticketing counter
  • Upgrading of Touch & Go counter
  • New tiling works at vestibule level
  • Upgrading for additional power supply
  • New LED and energy saving light fittings
  • Refurbishment of existing toilets and upgrading of engineering facilities.